This Mt Cook development in Wellington containing 20 units and specialising in social housing for people with disabilities was completed with an ETC service from Maltbys Wellington in March 2019. Construction cost circa $7.6m.
This 21-unit social housing project was completed in February 2019 with an ETC service from Maltbys Wellington. The development catered to senior citizens. Construction cost circa $4.1m.
Maltbys Wellington is providing an ETC service for this 36-unit development in Newtown, Wellington. They will replace the former units with an emphasis on energy efficiency. Construction cost circa $4.4m.
This project is currently under construction and once finished, will be a new residential development in Wellington with 11 units for which Maltbys Wellington will be providing a full QS service. Construction cost circa $5.8m.
This project, completed in March 2019, is a new residential build in Trent Street, Wellington. Once finished, it will contain 17 units for which Maltbys Wellington provided a full QS service. Construction cost circa $4.1m.
This Berhampore social housing development was finished in September 2018. The development contains 34 units and Maltbys Wellington provided an ETC service. Construction cost circa $8m.
Naenae Road in Wellington will be a brand new, 37-unit residential development for Housing New Zealand which is currently under construction during which Maltbys Wellington will provide a full QS service. Construction cost circa $10m.
This brand new residential development for Housing New Zealand in Strathmore Park, Wellington is currently under construction. One completed, there will be 12 units for which Maltbys Wellington will be providing a full QS service. Construction cost circa $3.3m.
This new high-rise residential development of apartments in Wellington was completed in December 2018 and contains 26 units. Maltbys Wellington provided a full QS service for this project. Construction cost circa $12.3m.
Construction of 8 Townhouses in Island Bay, Wellington. Construction was completed in December 2016.
Construction of 17 Townhouses in Ngaio, Wellington. Construction is expected for completion in late 2018.
Seventeen unit subdivision comprising eight 2 bed duplexes, four 3 bed and five 4 bedroom houses. Project due for completion mid 2018. Construction cost $5.8m.
Thirteen unit subdivision comprising six 2 bed duplex�s, two 3 bed, four 4 bed and one 5 bed detached houses. Project completed March 2018. Construction cost $3m.
Seven unit subdivision comprising seven duplex houses. Project completed January 2018. Construction cost $1.5m
Five unit subdivision comprising two 2 bed duplex�s, one 3 bedroom and two 4 bedroom detached houses. Project completed in September 2017. Construction cost $1.97m.
Seven unit subdivision comprising four 2 bed duplex�s, three 4 bedroom and one 3 bedroom detached houses. Project completed in September 2017. Construction cost $2.8m.
Nine unit subdivision comprising four 2 bed duplex�s and three 3 bedroom detached houses. Project completed in September 2017. Construction cost $3.1m.
Eight unit subdivision comprising eight 2 bed duplex houses. Project completed in two separable portions in May and July 2017. Construction cost $2.4m.
New 16 level apartment building plus basement carpark level and ground floor retail/commercial level. Construction in progress and due for completion mid 2019. Construction cost $22.65m.
Redevelopment of an existing heritage building, including significant seismic and structural upgrade works and the addition of an additional floor level to provide 6 levels of apartments (30 apartments in total). Construction cost $5.2m. Completed in October 2015.
Redevelopment of an eight level office building into 80 apartments across nine levels (1,2 & 3 bedroom), basement carparking and 2 retail levels, adjacent to MIT in Putney Way, Manukau City. Total project cost is $17m. Completed in October 2014.
Total internal and external refurbishment of 3 Nr three storey apartment buildings, including new carparking and landscaping. Project completed in July 2011. Construction cost $5.3m.
Major redevelopment of land around Ernie Pinches Street including constructing 45 new units of varying types, together with the refurbishment and relocation of 13 units and the refurbishment of a further 10 units on the site. The redevelopment also includes the removal of several existing units and involves major civil and infrastructure works. Total budget $18.5m. Final stage completed in April 2011.
Construction of 66 new apartments and community area, along with landscaped areas and a new access road. Project completed in May 2010. Construction cost $9.9m.
Housing development comprising a total of 60 new residential units, including 24 pensioner units, 12 two bed apartments, 20 two bed terrace houses and 4 three bed townhouses. Project completed in November 2009. Total project cost $19.3m.
Retirement village on greenfield site. Bulk earthworks and site retaining walls for the development is complete, together with infrastructure for stage 1. Stage 1 villas (32 Nr) completed in stage blocks with final block of villas completed in september 2009. Stage 1 project cost $18.8m.
Retirement village on greenfield site. Stage 1 infrastructure complete and stage 1 villas (24 Nr) completed in April 2009. Stage 1 project cost $8.5m
Retirement village on greenfield site comprising 96 villas, together with a main building which includes 46 apartments and all of the recreational and administrative facilities for the village. The final stage of 62 villas was completed in March 2009.
New apartment building housing 48 apartments on eight levels, plus ground floor retail and three levels of basement parking. Project includes the retention of a historic building façade. Completed February 2009. Construction value $14.5m.
New two/three level high quality apartment building comprising of 39 apartments together with communal spaces. Stage 1 Block A completed in December 2008. Stage 1 construction value $3.5m.
20 level apartment building housing 114 residential apartments and 4 retail units, including 141 carparks. Completed in November 2008. Construction cost approx $23.5m.
Main building (D) and apartment building (C) completed in March 2009. Main Building includes all of the common, administration and recreational facilities for the village, and includes 19 independent apartments, 23 serviced apartments and 52 care facility beds. Apartment building C which is attached to the main building includes 52 independent apartments on four levels, together with a basement carpark. Construction value $37m
Retirement village on greenfield site. Stage 1 completed in 2006 and comprising 33 villas together with roading and infrastructure for the full development. Stage 2 villas (39 Nr) completed in December 2008. Stage 3 main building completed in March 2009.
Housing development comprising a total of 34 Nr houses, ranging from 2 bed single level to 5 bed two storey houses. Construction value $7.5m. Completed in May 2008.
New tiered three/four level high quality apartment building comprising 71 apartments (mix of 2 and 3 bedrooms) with basement carparking and workshop facilities for The Links golf course. Project also includes extensions and refurbishment of the existing Village Community Centre building. Construction cost $24m. Completed in April 2008.
The construction of 14 high quality ‘alpine style’ apartments in 6 blocks perched half way up Queenstown Hill with sweeping views over the Wakatipu. A combination of schist, cedar and macrocarpa ensure that these units blend into the surrounding area. Cost $14m. Completed October 2007.
Apartment development on the shores of Lake Wakatipu comprising 46 apartments with 2 levels of underground carparking. The site involved substantial earthworks and retaining and upgrading of the existing access road. Maltbys provided the role of Bank QS. Cost $22.5m. Completed in September 2007.
Housing development comprising a total of 21 Nr houses, ranging from 2 bed single level houses to 4 bed two storey houses. Construction value $4.5m. Staged completion/handover of units in July and September 2007.
A 15 unit development on a steep lake front site on Frankton Road, Queenstown. Cost $22.9m. Completed May 2007.
Retirement village on greenfield site comprising 94 villas, 16 serviced apartments, Care facility and Recreation centre.Completed in 2007. Construction cost $22m.
A prime location on the lakeshore of Lake Wakatipu, the 16 two level units with separate garaging, and associated external works is the first stage of this multi stage development. Queenstown villas provide beautiful views over Lake Wakatipu and retains easy walking into Central Queenstown. Maltbys provided the role of Bank QS. Cost $6.3m. Completed November 2006.
This is the creation of a whole new township at the base of the Remarkables. Stages 1 & 2 involved a 380 lot sub-division and an 18 hole golf course complete with full services infrastructure comprising – roading, 2 mega litre water reservoir, water pumping line, package sewerage treatment plants, 33KVa electrical substation. Completed in 2006. Cost $40m.
Two 19 level apartment towers housing a combined total of 320 apartments designed for student accommodation. Completed in 2006. Construction cost $39.5m.
First Stage of a multi staged development, comprising of 68 apartments overlooking Lake Wakatipu. Completed in 2005. Cost $25m.
Second tower of The Landings Parnell development, comprising 110 apartments in a 10 level tower, with basement carparking completed in the Stage One contract. Completed in 2005. Construction cost $16m.
New subdivision comprising of 16 three and four bed townhouses on a steeply sloping site. Houses built in two stages of 8 units. Last stage completed in 2005. Cost $3.4m.
First tower of The Landings Parnell development, comprising 112 apartments in an 8 level tower, with basement carparking and community facilities. Completed in 2004. Construction cost $20m.
A single 19 level tower comprising a mix of two and three bedroom apartments designed for student accommodation. Completed in 2004. Construction cost $14m.
A new four level, plus basement carpark level, apartment building housing 23 luxury apartments. Completed in 2004. Construction cost $5.9m.
Two 18 level apartment towers housing a combined total of 138 one and two bed apartments designed for student accommodation. Completed in 2003. Construction cost $9m.