Construction of a new retail complex consisting of 5 new Retail spaces at 19 Chalmers Street, Hornby, Christchurch, for the Hornby Working Men’s Club. Completed in March 2015. Construction cost $7.8m.
Engaged by Foodstuffs, Maltbys provided full QS services on the Newlands New World project. A supermarket with undercover basement carpark on a prominent corner site it was completed in 2012 with a construction value of $9.5m.
One of the first new developments in the area known as the ‘Tank Farm’ on Auckland’s waterfront. The development comprises two new buildings with a total floor area of 1351m2, together with the upgrade of the existing Heritage Cargo Shed building which sits between them. The new buildings house pub and restaurant tenancies as part of a new vibrant Jellicoe Street upgrade with links back across to the Viaduct Harbour. Construction cost $6.9m. Completed in May 2011.
Modernisation, extension and alterations to existing New World Supermarket. Staged to enable operations to continue throughout the construction period, it was completed in 2011 with a construction cost of $6.5m.
Redevelopment of the existing basement, ground and first floors of the Tower, together with new external facade to Queen and Swanson Streets. The basement and ground floors to be completed as retail shells and the first floor to be completed as base fitout office spaces, together with a coffee bar. Construction cost $4.5m. Completed November 2010.
New specialist retail development comprising three separate buildings of single and two level construction plus basement carparking. A total of 15 tenancies including dentist, restaurants, tavern and fast-food outlets. Construction cost $5.5m. Completed July 2008.
New main entry to existing exhibition halls 1 and 2, including foodcourt, commercial kitchen, public toilets and function room. Completed in 2006. Construction cost $8.5m. Stage 2 new pavillions completed April 2007. Construction cost $11.4m.
Three storey Michael Wyatt designed building extension comprising retail and tourism activity booking facilities and upper level offices (including MALTBYS). The unique black curved precast concrete panels gives the building it's presence. Completed in 2005. Construction cost $5m.
Refurbishment of existing store. Completed in 2005. Construction cost $2.5m.
Another retail building adding to the collection at Remarkables Retail Park near the Queenstown airport. A basement carpark, 6 retail outlets and 2 upper levels of office space. Completed in 2005. Cost $6m.
New Pak N Save supermarket with a floor area of 7,000m2. The supermarket includes undercover basement carparking, forecourt carparking on a suspended deck and fuel outlet. Completed in 2005. Construction cost $15.6m.
Major structural upgrade of existing the building, undertaken whilst maintaining business as usual for the retail operation. Completed in 2004. Construction cost $3.8m.
New foodcourt and fashion precinct. Completed in 2003. Construction cost $4.5m.
Total redevelopment of major shopping centre and carpark complex in 6 stages. Included 60,000m2 of extended retail and 100,000m2 of extended carparking. Completed in 2002. Construction cost confidential.
Project was developed on a 22 acre site and included a main administration building, main car auction hall and five ancillary auction support buildings. The centre also included a large public cafeteria and carparking for around 1000 cars. Completed in 2001. Construction cost $20m.
Major Greenfield retail development at Botany Downs comprising 70,000m2 of retail space and 6,000m2 of office space. Includes major department stores, supermarket, large format retail, specialty retail and all carparking, landscaping and roading. Completed in 2001. Construction cost $100m.